Starting April 8 through April 19 from the hours of 9am-3pm. RJV Construction will be required to tie-in the sewer and drain on Clifford Street into the new sewer and drain installed in Blue Hill Ave. Traffic will be impacted. For more information the link.
East Boston
Replacement of water mains and the replacement and rehabilitation of sewers and drains on various streets in East Boston. The purpose of the project is to improve the water distribution system and upgrade aging sewerage and drainage systems in East Boston.
Project Contacts
Contract Number:
16-308-001Project Summary
Completed Work
- Replaced 1,730 feet of water mains in East Boston
- Replaced 320 feet of sewer and drain pipes on Gove Street
- Replaced feet of sewer and drain pipes in East Boston
- Installed 960 feet of new drains on Porter and Paris Streets
- Rehabilitation of 2,370 feet of sewer and drain pipes
Upcoming Work
- 400' of water main replacement on Shelby Street
- Gas line relocation
Anticipated Impacts
The anticipated impacts include water service interruptions, noise, traffic and parking modifications, rodent activity, dust, and general construction impacts. The contractor will be required to minimize impacts to the extent feasible.
Surface Restoration
Temporary restoration of roadways, sidewalks and other areas disturbed by construction will be completed under this contract. A permanent restoration will occur under a separate paving contract. Concrete or Brick sidewalks will be restored within six weeks, weather dependent.